top of page
Alan Higgs Centre
Alan Higgs Centre
1/1
Project:
Alan Higgs Centre
Custom Roofing
​
The Alan Higgs Centre was a local project that we completed working alongside Galiford Try, which involved the construction of internal steels for the centre's new 50m Olympic sized swimming pool. The first water to fill the pool can be seen in this photo aswell as the steel installed to strengthen the structure made by Coventry Construction.
DATE:
21st March 2020
​
SECTOR:
Recreational
​
Tn: xxxx
BACK TO PROJECTS
bottom of page